This page was exported from Free Exams Dumps Materials [ http://exams.dumpsmaterials.com ] Export date:Thu Nov 21 18:37:12 2024 / +0000 GMT ___________________________________________________ Title: 100% Accurate Answers! Jul-2023 API-570 Actual Real Exam Questions [Q45-Q67] --------------------------------------------------- 100% Accurate Answers! Jul-2023 API-570 Actual Real Exam Questions Best Value Available! 2023 Realistic Verified Free API-570 Exam Questions To be eligible for the API-570 certification exam, candidates must meet certain requirements. They must have a minimum of three years of experience in the field of piping inspection and must have completed a recognized training program or have a degree in engineering or a related field. Candidates must also pass the API-570 pre-exam to demonstrate their knowledge of the exam topics.   NEW QUESTION 45For 1 1/4″ thick carbon steel, what is the recommended preheat temperature?  300°F  235°F  175°F  None NEW QUESTION 46To evaluate the effects of fire damage, an assessment should be performed in accordance with____.  API RP 579, Section 11  API RP 2207 Section 2  API 598, Section 1  ASME 816.5 NEW QUESTION 47Appropriate permanent and progressive records on each piping system shall include.  all original construction data  all jurisdictional requirements  original heat and batch numbers  system service; classification; identification numbers NEW QUESTION 48Is the attached PQR properly qualified?  No, because RT is not allowed during PQR qualification  No, because there are not enough tensile tests  No, because peening is allowed by ASME B31.3  Yes NEW QUESTION 49A specialized valve generally used in erosive or high-temperature service is a valve  swing check  slide  plug  globe NEW QUESTION 50A piping inspector employed by the owner operator shall have  an API 653 certification  an AWS certification  an API 510 certification  not less than 10 years experience dealing with piping NEW QUESTION 51Where should the numbers be placed on a radiograph?  Under the film  On the material being radiographed  Under the material being radiographed  On the film source pack NEW QUESTION 52Who is authorized to make a tack weld?  A qualified welder  A helper  A fitter  The welding foreman NEW QUESTION 53In piping systems, the most easily detected problem during operation is.  pipe wall thickness  pipe wall thinness  pipe coating condition  leaks NEW QUESTION 54What is the definition of normalizing?  Rapid cooling of a heated metal  Heating an alloy to a suitable temperature, holding that temperature long enough to allow constituents to enter into solid solution and then cooling ~ rapidly enough to hold the constituents.  Process where a ferrous metal is heated to a suitable temperature above the transformation range and is subsequently cooled in still air at room temperature.  Heating to and holding at a suitable temperature and then cooling at a suitable rate to reduce hardness, improve machinability, facilitate cold working, etc. NEW QUESTION 55A piping system that operates at a design pressure of 100 psi at 950? F was originally built from NPS 20 EFW (100% radiographed), ½” wall, A-516 Grade 70, A-671 material. During the last Inspection, the thickness was determined to be 0.370 inches. The records indicated the corrosion rate to be 0.009 inches per year.What is MAWP if the next inspection is planned in 5 years?  126 psi  285.17 psi  98.23 psi  Not enough information given NEW QUESTION 56What is the root face limitation as listed on the attached WPS and PQR  3/32″  1/8″  No limit  Not designated NEW QUESTION 57Exemptions for preheating and post weld heat treatment must be approved by the____.  piping engineer  inspector  applicable standard, API 570  repair procedure. NEW QUESTION 58What is the maximum length allowed for individual slag trapped in a weld in a Severe Cyclic Conditions piping system?  >TW X 3  £TW / 3  ³12T  3/23″ NEW QUESTION 59Can the inspection interval of the system in question 24 be increased to 8 years?  No  Yes  If the system was insulated, the interval can be extended  Not enough information given NEW QUESTION 60A transverse crack was discovered in the root pass of a completed weld on the outside of a Category D Fluid Service piping system during a PT test.Which of the following,” statements is most accurate?  The weld is acceptable  The PT test should be repeated  The welder should be requalified  The PT test will not show this type of discontinuity from the outside NEW QUESTION 61What the MAWP is recalculated, the wall thickness used shall be the actual thickness minus:  The estimated corrosion loss before the date of the next inspection  Twice the estimated corrosion loss before the date of the next inspection  Three times the estimated corrosion loss before the date of the next inspection  The estimated corrosion loss before the date of the next inspection NEW QUESTION 62What is the maximum allowable deviation for the ammeter on each piece of magnetizing equipment?  30%  10%  20%  15% NEW QUESTION 63In the AWS D 5.1, what is the designation for cellulose DCEP electrode?  E 7018  E 7016  E 6011  E 6010 NEW QUESTION 64What should have been the correct number and type of guide bends on the PQR?  6 side bends  2 face and 2 root bends  1 side, 1 face and 1 root bend  No side bends required NEW QUESTION 65Welding procedures qualified by may be used, subject to the specific approval of the inspector  others  the employer  the use of AWS pre qualified, D1.1 type procedures  the use of API 1104 qualified procedures NEW QUESTION 66A DC yoke shall have a lifting power of at least  5 lbs.  8 lbs.  10 lbs.  40 lbs. NEW QUESTION 67API 570 was developed to provide for the inspection of in-service process piping.  recommendations  suggestions  general guidelines  an industry standard  Loading … Actual Questions Answers Pass With Real API-570 Exam Dumps: https://www.dumpsmaterials.com/API-570-real-torrent.html --------------------------------------------------- Images: https://exams.dumpsmaterials.com/wp-content/plugins/watu/loading.gif https://exams.dumpsmaterials.com/wp-content/plugins/watu/loading.gif --------------------------------------------------- --------------------------------------------------- Post date: 2023-07-10 13:49:29 Post date GMT: 2023-07-10 13:49:29 Post modified date: 2023-07-10 13:49:29 Post modified date GMT: 2023-07-10 13:49:29