Pass Your ISQI CTFL_Syll2018 Exam with Correct 355 Questions and Answers [Q81-Q101]


Rate this post

Pass Your ISQI CTFL_Syll2018 Exam with Correct 355 Questions and Answers

Latest [Feb 05, 2024] 2024 Realistic Verified CTFL_Syll2018 Dumps

ISQI CTFL_Syll2018 (ISTQB Certified Tester Foundation Level (Syllabus 2018)) exam is an essential certification for software testing professionals who want to enhance their knowledge and skills in this field. It is based on the latest syllabus released by the ISTQB and covers a wide range of topics related to software testing. ISTQB Certified Tester Foundation Level (Syllabus 2018) certification can help professionals advance their careers and become experts in specific areas of software testing.

 

NEW QUESTION 81
A calculator software is used to calculate the result for 5+6.
The user noticed that the result given is 6.
This is an example of:

 
 
 
 

NEW QUESTION 82
Which of the following represents good testing practice for testers, irrespective of the software lifecycle model
used?

 
 
 
 

NEW QUESTION 83
A new testing tool has been selected for an organisation and a pilot project has successfully completed. The next step is to deploy the tool within the organization.
What is a key success factor in tool deployment?

 
 
 
 

NEW QUESTION 84
When testing a mission critical system a high coverage should be achieved. Which of the following techniques
should be implemented as a structural based coverage technique in order to achieve highest coverage?

 
 
 
 

NEW QUESTION 85
Which of the following defects-can

 
 
 
 

NEW QUESTION 86
A program is used to control a manufacturing line (turn machines on and off. start and stop conveyor belts,
add raw materials to the flow, etc.)
Not all actions are possible at all times For example, there are certain manufacturing stages that cannot be
stopped – unless there is an emergency. A tester attempts to evaluate if all such cases (where a specific action
is not allowed) are covered by the tests. Which coverage metric will provide the needed information for this
analysis?

 
 
 
 

NEW QUESTION 87
You are performing a review of your colleague’s test cases based on the following test basis document:

The Test Cases are as follows:
TC1. Success – valid ‘User Name’ and ‘Password’; Customer Menu displayed
TC2. Failure – ‘User Name’ field has blank entry; Error Number 12 displayed
TC3. Failure – ‘User Id’ entered does not exist on database (i.e. unregistered user); Error Number 23 displayed
TC4. Failure – ‘Password’ entered does not match user’s password on database; Error Number 24 displayed
You are guided by the following checklist in your review:
C1. There must be one test case to cover success
C2. There must be one test case for each error path (e.g. validation failure)
C3. Each test case must use terminology consistent with the test basis document (field names, error
numbering, etc.)
Record a separate defect for each missing test case (checklist items C1 and C2) and for each test case that does
not meet checklist item C3.
How many defects should you record?

 
 
 
 

NEW QUESTION 88
Which of the following test design techniques is classified as a structure-based (white box) technique? [K1]

 
 
 
 

NEW QUESTION 89
Which of the following is NOT an example of a common test metric?

 
 
 
 

NEW QUESTION 90
The Cambrian Pullman Express has special ticketing requirements represented by the partial decision table below.
Refer to the exhibit

Carol has a student railcard and is travelling on a Flexible Standard Class ticket. James has a senior railcard and is travelling on a super saver ticket. Which of the options represents the correct actions for these two test cases? [K3]

 
 
 
 

NEW QUESTION 91
The following test cases for a Library Management System are available to test changes made to the functions and data structures associated with borrowers
1. Add a new borrower to the system
2. Update a borrower’s data
3. Remove a borrower from the system
4. Loan a book to a borrower
5. Return a book from a borrower
6. Reserve a book for a borrower
7. Send “reservation ready” message to a borrower
Which of the following test sequences represents a possible use case? (a test sequence always start with test #1)

 
 
 
 

NEW QUESTION 92
Which of the following correctly states a limitation in the use of static analysis tools? [K1]

 
 
 
 

NEW QUESTION 93
In foundation level syllabus you will find the main basic principles of testing, Which of the following
sentences describes one of these basic principles?

 
 
 
 

NEW QUESTION 94
Choose below the best characterization of the difference between black-box testing and white-box testing

 
 
 
 
 

NEW QUESTION 95
Which of the following is an example of black-box dynamic testing?

 
 
 
 

NEW QUESTION 96
Which of the following is an example of Static testing?

 
 
 
 

NEW QUESTION 97
Which of the following test organizations has the highest level of independence?

 
 
 
 

NEW QUESTION 98
Your task is to compile a test execution schedule for the current release of software.
The system specification states the following logical dependencies:
* An admin user must create/amend/delete a standard user.
* A standard user is necessary to perform all other actions.
The test plan requires that re-tests must be performed first, followed by the highest priority tests. To save time, the test plan states that tests should be scheduled to create test data for the subsequent tests in the schedule.
The following test cases have been designed, with an indication of priority (1 being the highest priority) and whether the test has previously failed.

Which test execution schedule meets the test plan requirements and logical dependencies?

 
 
 
 

NEW QUESTION 99
Which of the following is a factor that could negatively influence the success of the deployment of a tool within an organization?

 
 
 
 

NEW QUESTION 100
Which of the following would be LEAST appropriate as part of an incident report covering the observation of a failure during testing?

 
 
 
 

NEW QUESTION 101
Testing and Debugging are key activities in the software development lifecycle.
Which of the following are DEBUGGING activities?
a) Designing tests to find failures.
b) Locating the cause of failures.
c) Analysing and fixing the defects.
d) Executing tests to show failures.

 
 
 
 

The CTFL_Syll2018 exam is intended for individuals who are new to software testing or have limited experience in the field. It is ideal for software developers, testers, quality assurance professionals, and anyone who is interested in pursuing a career in software testing. CTFL_Syll2018 exam is also suitable for those who are looking to enhance their knowledge and skills in software testing.

 

Get 2024 Updated Free ISQI CTFL_Syll2018 Exam Questions and Answer: https://www.dumpsmaterials.com/CTFL_Syll2018-real-torrent.html

         

Leave a Reply

Your email address will not be published. Required fields are marked *

Enter the text from the image below