[Jan 07, 2025] PSK-I Dumps PDF and Test Engine Exam Questions – DumpsMaterials [Q13-Q31]


Diesen Beitrag bewerten

[Jan 07, 2025] PSK-I Dumps PDF and Test Engine Exam Questions – DumpsMaterials

Verified PSK-I exam dumps Q&As with Correct 75 Questions and Answers

FRAGE 13
True or False: Work Item Age is a leading indicator for the length of the Scrum Team’s feedback loop for that (in progress) item.

 
 

FRAGE 14
True or False: Cycle Time is a direct leading indicator for the length of the Scrum Team’s feedback loop for a Product Backlog item.

 
 

FRAGE 15
Which of the following is NOT a flow metric?
(wählen Sie die beste Antwort)

 
 
 
 
 

FRAGE 16
A Service Level Expectation (SLE) consists of which two items?
(Choose the best two answers)

 
 
 
 

FRAGE 17
True or False: Scrum Teams using Kanban can replace Sprint Planning with just-in-time feature planning.

 
 

FRAGE 18
Who is best to decide if a Scrum Team should apply a Kanban strategy in their Scrum framework? (choose the best answer)

 
 
 
 
 

FRAGE 19
Which of the following metrics are likely to be reviewed during flow-based Daily Scrum?
(choose the best two answers)

 
 
 
 
 
 
 

FRAGE 20
Which is the LEAST accurate description of Cycle Time? (choose the best answer)

 
 
 
 

FRAGE 21
Which of the following is TRUE about the relationship between Sprints and Kanban for Scrum? (choose the best three answers)

 
 
 
 

FRAGE 22
True or False: A team’s future performance can be determined by using Little’s Law. (Choose the best answer)

 
 

FRAGE 23
In the context of Kanban, which statement best describes flow? (choose the best answer)

 
 
 
 

FRAGE 24
What is Kanban?
(wählen Sie die beste Antwort)

 
 
 
 

FRAGE 25
Which of these metrics is most valuable for Sprint Planning? (Choose the best answer)

 
 
 
 

FRAGE 26
Within the same Kanban system, Work in Progress (WIP), is NOT a leading indicator for:
(wählen Sie die beste Antwort)

 
 
 
 

FRAGE 27
Scrum Teams using Kanban can start to increase predictability by:

 
 
 
 

FRAGE 28
True or False: When the Developers add Kanban to Scrum, the way they use the Sprint Goal during their Daily Scrum changes.

 
 

FRAGE 29
What are the two things that constitute a Kanban board?
(Choose the best two answers)

 
 
 
 

FRAGE 30
What is the flow metric used to forecast the number of items that will be finished per unit of time. (choose the best answer)

 
 
 
 

FRAGE 31
Kanban for Scrum Teams is built upon which Scrum Values? (choose the best three answers)

 
 
 
 
 

Scrum PSK-I Test Engine PDF – All Free Dumps: https://www.dumpsmaterials.com/PSK-I-real-torrent.html

         

Eine Antwort hinterlassen

Deine E-Mail-Adresse wird nicht veröffentlicht. Erforderliche Felder sind mit * markiert

Geben Sie den Text aus dem Bild unten ein