[Jan 07, 2025] PSK-I Dumps PDF and Test Engine Exam Questions – DumpsMaterials [Q13-Q31]


この記事を評価する

[Jan 07, 2025] PSK-I Dumps PDF and Test Engine Exam Questions – DumpsMaterials

Verified PSK-I exam dumps Q&As with Correct 75 Questions and Answers

質問13
True or False: Work Item Age is a leading indicator for the length of the Scrum Team’s feedback loop for that (in progress) item.

 
 

質問14
True or False: Cycle Time is a direct leading indicator for the length of the Scrum Team’s feedback loop for a Product Backlog item.

 
 

質問15
Which of the following is NOT a flow metric?
(最もよい答えを選びなさい)

 
 
 
 
 

質問16
A Service Level Expectation (SLE) consists of which two items?
(Choose the best two answers)

 
 
 
 

質問17
True or False: Scrum Teams using Kanban can replace Sprint Planning with just-in-time feature planning.

 
 

質問18
Who is best to decide if a Scrum Team should apply a Kanban strategy in their Scrum framework? (choose the best answer)

 
 
 
 
 

質問19
Which of the following metrics are likely to be reviewed during flow-based Daily Scrum?
(choose the best two answers)

 
 
 
 
 
 
 

質問20
Which is the LEAST accurate description of Cycle Time? (choose the best answer)

 
 
 
 

質問21
Which of the following is TRUE about the relationship between Sprints and Kanban for Scrum? (choose the best three answers)

 
 
 
 

質問22
True or False: A team’s future performance can be determined by using Little’s Law. (Choose the best answer)

 
 

質問23
In the context of Kanban, which statement best describes flow? (choose the best answer)

 
 
 
 

質問24
What is Kanban?
(最もよい答えを選びなさい)

 
 
 
 

質問25
Which of these metrics is most valuable for Sprint Planning? (Choose the best answer)

 
 
 
 

質問26
Within the same Kanban system, Work in Progress (WIP), is NOT a leading indicator for:
(最もよい答えを選びなさい)

 
 
 
 

質問27
Scrum Teams using Kanban can start to increase predictability by:

 
 
 
 

質問28
True or False: When the Developers add Kanban to Scrum, the way they use the Sprint Goal during their Daily Scrum changes.

 
 

質問29
What are the two things that constitute a Kanban board?
(Choose the best two answers)

 
 
 
 

質問30
What is the flow metric used to forecast the number of items that will be finished per unit of time. (choose the best answer)

 
 
 
 

質問31
Kanban for Scrum Teams is built upon which Scrum Values? (choose the best three answers)

 
 
 
 
 