免费考试试卷材料
https://exams.dumpsmaterials.com/zh/2025/01/07/jan-07-2025-psk-i-dumps-pdf-and-test-engine-exam-questions-dumpsmaterials-q13-q31/
Export date: Sat Feb 22 10:18:30 2025 / +0000 GMT

[Jan 07, 2025] PSK-I Dumps PDF and Test Engine Exam Questions - DumpsMaterials [Q13-Q31]




[Jan 07, 2025] PSK-I Dumps PDF and Test Engine Exam Questions - DumpsMaterials

Verified PSK-I exam dumps Q&As with Correct 75 Questions and Answers

问题 13
True or False: Work Item Age is a leading indicator for the length of the Scrum Team’s feedback loop for that (in progress) item.

 
 

问题 14
True or False: Cycle Time is a direct leading indicator for the length of the Scrum Team’s feedback loop for a Product Backlog item.

 
 

问题 15
Which of the following is NOT a flow metric?
(请选择最佳答案)

 
 
 
 
 

问题 16
A Service Level Expectation (SLE) consists of which two items?
(Choose the best two answers)

 
 
 
 

问题 17
True or False: Scrum Teams using Kanban can replace Sprint Planning with just-in-time feature planning.

 
 

问题 18
Who is best to decide if a Scrum Team should apply a Kanban strategy in their Scrum framework? (choose the best answer)

 
 
 
 
 

问题 19
Which of the following metrics are likely to be reviewed during flow-based Daily Scrum?
(choose the best two answers)

 
 
 
 
 
 
 

问题 20
Which is the LEAST accurate description of Cycle Time? (choose the best answer)

 
 
 
 

问题 21
Which of the following is TRUE about the relationship between Sprints and Kanban for Scrum? (choose the best three answers)

 
 
 
 

问题 22
True or False: A team’s future performance can be determined by using Little’s Law. (Choose the best answer)

 
 

问题 23
In the context of Kanban, which statement best describes flow? (choose the best answer)

 
 
 
 

问题 24
What is Kanban?
(请选择最佳答案)

 
 
 
 

问题 25
Which of these metrics is most valuable for Sprint Planning? (Choose the best answer)

 
 
 
 

问题 26
Within the same Kanban system, Work in Progress (WIP), is NOT a leading indicator for:
(请选择最佳答案)

 
 
 
 

问题 27
Scrum Teams using Kanban can start to increase predictability by:

 
 
 
 

问题 28
True or False: When the Developers add Kanban to Scrum, the way they use the Sprint Goal during their Daily Scrum changes.

 
 

问题 29
What are the two things that constitute a Kanban board?
(Choose the best two answers)

 
 
 
 

问题 30
What is the flow metric used to forecast the number of items that will be finished per unit of time. (choose the best answer)

 
 
 
 

问题 31
Kanban for Scrum Teams is built upon which Scrum Values? (choose the best three answers)

 
 
 
 
 

Scrum PSK-I Test Engine PDF - All Free Dumps: https://www.dumpsmaterials.com/PSK-I-real-torrent.html 1

链接
  1. https://www.dumpsmaterials.com/PSK-I-real-torrent. html
Post date: 2025-01-07 16:37:40
Post date GMT: 2025-01-07 16:37:40

Post modified date: 2025-01-07 16:37:40
Post modified date GMT: 2025-01-07 16:37:40

Export date: Sat Feb 22 10:18:30 2025 / +0000 GMT
本页从免费考试试卷材料导出 [ http://exams.dumpsmaterials.com ]