[Feb-2025] D-PSC-MN-01 Dumps PDF – D-PSC-MN-01 Real Exam Questions Answers [Q85-Q99]


给本帖评分

[Feb-2025] D-PSC-MN-01 Dumps PDF – D-PSC-MN-01 Real Exam Questions Answers

D-PSC-MN-01 Dumps 100% Pass Guarantee With Latest Demo

EMC D-PSC-MN-01 Exam Syllabus Topics:

主题 详细信息
主题 1
  • PowerScale Implementation: Geared towards cluster administrators, this section covers the practical aspects of implementing PowerScale systems. It focuses on creating new clusters, integrating nodes into existing clusters, and applying alternative configurations or accessories to improve performance.
主题 2
  • PowerScale Hardware Installation: This section evaluates the installation capabilities of hardware engineers to test candidates on their ability to plan and execute the installation of PowerScale hardware, prepare the maintenance site, and adhere to best practices when installing racks, nodes, and related components.
主题 3
  • PowerScale Hardware Concepts: This part of the exam assesses the expertise of IT infrastructure architects, and emphasizes the ability to differentiate between the architectural elements of PowerScale platforms, understand their specific use cases, and compare design specifications across PowerScale hardware models.
主题 4
  • PowerScale Hardware Maintenance: Targeted at system administrators, this section focuses on key tasks involved in maintaining PowerScale hardware. It examines candidates’ proficiency in completing initial maintenance steps, preparing nodes for operation, and processing Field Replaceable Unit (FRU) and Customer Replaceable Unit (CRU) requests.

 

新问题 85
How do external networking requirements for a PowerScale cluster typically differ from internal requirements?

 
 
 
 

新问题 86
During a PowerScale cluster upgrade, what is the importance of managing versioning effectively?

 
 
 
 

新问题 87
What is a critical consideration when handling upgrades and patching in a PowerScale environment?

 
 
 
 

新问题 88
A platform engineer is tasked with adding F600 nodes to an existing Dell EMC PowerScale cluster. After racking and stacking the F600 nodes, they determine that the cluster contains X210 and H400 nodes.
What should the platform engineer consider?

 
 
 
 

新问题 89
What is done with the components when a Gen6 single node is replaced?

 
 
 

新问题 90
Which two backend switches support 100 GbE?

 
 
 
 

新问题 91
An engineer runs ini_reformat_node command.
What are they attempting to do?

 
 
 
 

新问题 92
An engineer wants to create a 4-node cluster after rack and stack.
What port must they use to start the installation?

 
 
 
 

新问题 93
Which cluster management tool provides a graphical user interface for PowerScale clusters?

 
 
 
 

新问题 94
When testing connectivity to the Dell EMC PowerScale cluster through the Web Administration interface, what should be typed in the address line of the browser?

 
 
 
 

新问题 95
A company must ensure their PowerScale cluster can handle many active client connections. What must they do when designing their system?

 
 
 
 

新问题 96
A platform engineer cables, powers up, and creates a new cluster of F600 nodes. While performing verification checks, no clients can access the cluster and the engineer cannot ping the nodes.
What is the probable issue?

 
 
 
 

新问题 97
What type of privileges are required to perform tenant-specific administration?

 
 
 
 

新问题 98
When setting up internal networking for a PowerScale cluster, what is a crucial requirement?

 
 
 
 

新问题 99
Which Dell EMC PowerScale Gen 6 components are considered CRUs?

 
 
 
 

Dumps Real EMC D-PSC-MN-01 Exam Questions [Updated 2025]: https://www.dumpsmaterials.com/D-PSC-MN-01-real-torrent.html

         

发表回复

發佈留言必須填寫的電子郵件地址不會公開。 必填欄位標示為 *

输入下图中的文字