Q11. Which two of the following are means in which radiated interference primarily enters electronic devices?
(Select two options.)

 
 
 
 
 

Q12. Which of the following serves as a guiding principle for a program manager when preparing a program work breakdown structure?

 
 
 
 

Q13. A program manager for the construction of a ship reviews the program management plan with a shipyard representative. The shipyard representative indicates that while 65 percent progress was anticipated only 60 percent has been achieved What should the program manager do to ensure benefits realization?

 
 
 
 

Q14. A component project manager escalates an issue regarding a key stakeholder to the program manager. The key stakeholder does not respond to emails or phone calls and the project manager believes this key stakeholder is exhibiting a negative attitude toward the work. The key stakeholder has a significant influence over the component project which could impact other components if delays occur. The program manager’s attempts to reach the stakeholder via email also fail.
What should the program manager do next?

 
 
 
 

Q15. In preparation for the development and submission of the program master schedule to a client, the program manager meets with (he component project manager and master program scheduler to discuss the work breakdown structure (WBS) During the meeting, the master scheduler indicates that the master program schedule should include which of the following?

 
 
 
 

Q16. While setting up a program’s infrastructure and plan, a program management team develops documents and processes that provide commonality and consistency throughout the program’s components. What should the team also prepare, if not already provided by the organization’s assets?

 
 
 
 

Q17. An R&D group director approves a major program’s charter although the director has a high level of understanding of the program’s scope (hoy are unsure of how the program manager can be successful in delivering the program’s commitments What should the program manager do to align stakeholders with planning and monitoring the program’s progress?

 
 
 
 

Q18. A program manager prepares the program for review to secure funding by senior management. Which of the following must the program manager identify when creating the program charter?

 
 
 
 

Q19. A program stakeholder is concerned about information they receive about a project. Who is responsible for reviewing the communications management plan to assure adequate information is provided to the stakeholder’?

 
 
 
 

Q20. An ICT distribution designer installed a 50/1 ?5 mm/1300 nm fiber optic cable from Building A to identical Building B with a distance of 600 m (1968 ft) At Building B.
The designer fusion splice this new cable to an existing identical 50/126 mm fiber optic cable that runs 800 m (2525 ft) to Building C.
Both ends are terminated with SC connectors. What is the loss budget for the above fiber link?

 
 
 
 

Q21. In a budding with one join room for serving as the FR and EF and four dedicated TRs on the same floor a total of__________ 103 mm (4 trade size) conduits should be installed to interconnect the backbone pathways to the ER.

 
 
 
 

Q22. The size and number of conduits or sleeves used for backbone pathways depend on the usable floor space served by the backbone distribution system. What is the MINIMUM trade size of sleeves recommended to serve a TR, ER, or EF?

 
 
 
 

Q23. A telephone facility and an electrical facility are required in a tunnel. To reduce the effects of EMI and eliminate the need for additional shielding of the cables, where would each facility be placed?

 
 
 
 
 

Q24. Which two of the following types of metallic conduit REQUIRE threaded couplings? (Select two options.)

 
 
 
 
 

Q25. A new component project is approved by the program governance board. The funding for this component project will be provided by an organization different from the organization funding the program Would this be an acceptable funding arrangement?

 
 
 
 

Q26. Which of the following is a common application for exothermic welding of earthing (grounding) and bonding conductors?

 
 
 
 

Q27. A new program component provides an opportunity to enhance program outcomes. What does the program manager use to document and monitor the opportunity’?

 
 
 
 

Q28. The risk manager completes risk response planning. The risk manager believes that to effectively address all eventualities, an additional action is required.
What should the program manager do next?

 
 
 
 

Q29. A program manager initiates a new global program to create a higher level of protection for a company’s intellectual property. The company exhibits a relaxed culture and environment and is intolerant of processes to the point of being considered process-adverse However, the company’s culture is tolerant of long-term program activities, and provided there is continuous progress on improving the protection of its intellectual property Expectations for rapid progress are low What should the program manager do next?

 
 
 
 

Q30. Which of the following transmitter light sources has a MINIMUM bandwidth of 4700 MHz/km (EMB) at 850 nm”>

 
 
 
 

Q31. In a contiguous properly environment (e. g., where campus backbone cables exist), which two of the following are CRITICAL factors to understand for maintenance and growth purposes? (Select two options.)

 
 
 
 
 

Pass RCDDv14 Exam – Real Questions and Answers: https://www.dumpsmaterials.com/RCDDv14-real-torrent.html

         

Leave a Reply

Your email address will not be published. Required fields are marked *

Enter the text from the image below