To be eligible for the API-570 certification exam, candidates must meet certain requirements. They must have a minimum of three years of experience in the field of piping inspection and must have completed a recognized training program or have a degree in engineering or a related field. Candidates must also pass the API-570 pre-exam to demonstrate their knowledge of the exam topics.

 

NEW QUESTION 45
For 1 1/4″ thick carbon steel, what is the recommended preheat temperature?

 
 
 
 

NEW QUESTION 46
To evaluate the effects of fire damage, an assessment should be performed in accordance with____.

 
 
 
 

NEW QUESTION 47
Appropriate permanent and progressive records on each piping system shall include.

 
 
 
 

NEW QUESTION 48
Is the attached PQR properly qualified?

 
 
 
 

NEW QUESTION 49
A specialized valve generally used in erosive or high-temperature service is a valve

 
 
 
 

NEW QUESTION 50
A piping inspector employed by the owner operator shall have

 
 
 
 

NEW QUESTION 51
Where should the numbers be placed on a radiograph?

 
 
 
 

NEW QUESTION 52
Who is authorized to make a tack weld?

 
 
 
 

NEW QUESTION 53
In piping systems, the most easily detected problem during operation is.

 
 
 
 

NEW QUESTION 54
What is the definition of normalizing?

 
 
 
 

NEW QUESTION 55
A piping system that operates at a design pressure of 100 psi at 950? F was originally built from NPS 20 EFW (100% radiographed), ½” wall, A-516 Grade 70, A-671 material. During the last Inspection, the thickness was determined to be 0.370 inches. The records indicated the corrosion rate to be 0.009 inches per year.
What is MAWP if the next inspection is planned in 5 years?

 
 
 
 

NEW QUESTION 56
What is the root face limitation as listed on the attached WPS and PQR

 
 
 
 

NEW QUESTION 57
Exemptions for preheating and post weld heat treatment must be approved by the____.

 
 
 
 

NEW QUESTION 58
What is the maximum length allowed for individual slag trapped in a weld in a Severe Cyclic Conditions piping system?

 
 
 
 

NEW QUESTION 59
Can the inspection interval of the system in question 24 be increased to 8 years?

 
 
 
 

NEW QUESTION 60
A transverse crack was discovered in the root pass of a completed weld on the outside of a Category D Fluid Service piping system during a PT test.
Which of the following,” statements is most accurate?

 
 
 
 

NEW QUESTION 61
What the MAWP is recalculated, the wall thickness used shall be the actual thickness minus:

 
 
 
 

NEW QUESTION 62
What is the maximum allowable deviation for the ammeter on each piece of magnetizing equipment?

 
 
 
 

NEW QUESTION 63
In the AWS D 5.1, what is the designation for cellulose DCEP electrode?

 
 
 
 

NEW QUESTION 64
What should have been the correct number and type of guide bends on the PQR?

 
 
 
 

NEW QUESTION 65
Welding procedures qualified by may be used, subject to the specific approval of the inspector

 
 
 
 

NEW QUESTION 66
A DC yoke shall have a lifting power of at least

 
 
 
 

NEW QUESTION 67
API 570 was developed to provide for the inspection of in-service process piping.

 
 
 
 

Actual Questions Answers Pass With Real API-570 Exam Dumps: https://www.dumpsmaterials.com/API-570-real-torrent.html

         

Leave a Reply

Your email address will not be published. Required fields are marked *

Enter the text from the image below