[Jul-2024] NACE-CIP2-001 Exam Dumps Pass with Updated 2024 Coating Inspector Level 2 [Q48-Q68]


4/5 - (1 vote)

[Jul-2024] NACE-CIP2-001 Exam Dumps Pass with Updated 2024 Coating Inspector Level 2

Free NACE-CIP2-001 Exam Dumps to Pass Exam Easily

The benefits of earning the NACE-CIP2-001 certification are numerous. Coating Inspector Level 2 certification is recognized worldwide as a symbol of excellence in the coating inspection industry. It can help professionals advance their careers, increase their earning potential, and gain credibility and respect within the industry.

 

NO.48 Surface preparation of concrete is performed using:

 
 
 
 

NO.49 You have just your NACE CIP Level 2 certification when you are asked to supervise a team of uncertified field pipeline inspectors.
Your FIRST preferred course of action is to:

 
 
 
 

NO.50 You are the NACE Level 2 Coating Inspector where SSPC PA 2 has been specified with an additional requirement that no individual gauge reading shall be below a certain value.
As this is not part of the standard you should:

 
 
 
 

NO.51 You are working as an inspector in a galvanizing plant for the first time.
What are some of the hazards you need to be aware of:

 
 
 
 

NO.52 Because a NACE Level 2 Inspector has been trained in specific destructive tests, it is up to the Inspector to decide if and when a destructive test is required.

 
 

NO.53 Which surface preparation method uses a dilute acid solution to remove laitance and I roughen the concrete surface?

 
 
 
 

NO.54 Antifouling coatings are regulated by international treaties.

 
 

NO.55 The primary purpose of Fireproofing coatings are to provide:

 
 
 
 

NO.56 Inspection and Test Plans are provided to:

 
 
 
 

NO.57 Which product, when closely inspected has a green or red layer of fusion bonded epoxy (FBE) that is visible directly on the steel?

 
 
 
 

NO.58 Measuring methyl ethyl ketone (MEK) resistance of ethyl silicate inorganic zinc-rich primers by solvent rub requires

 
 
 
 

NO.59 When performing inspection in accordance with ASTM D 4138 the Inspector will use:

 
 
 
 

NO.60 NACE International Standards are developed by:

 
 
 
 

NO.61 Galvanizing performs best in which of the following exposures:

 
 
 
 

NO.62 The number of air turns in an enclosure can be affected by all of these EXCEPT

 
 
 
 

NO.63 Corrosion is the reverse process of

 
 
 
 

NO.64 You should bulk store coatings containing isocyanates

 
 
 
 

NO.65 Which is used to calibrate a pH meter?

 
 
 
 

NO.66 WJ-1 is always performed using UHWJ at pressures above 210 MPa (30,000 PSI)

 
 

NO.67 Cold-applied tape

 
 
 
 

NO.68 The Inspectors’ goal at the Pre-Job Conference is to:

 
 
 
 

NACE-CIP2-001 Exam Dumps, NACE-CIP2-001 Practice Test Questions: https://www.dumpsmaterials.com/NACE-CIP2-001-real-torrent.html

         

Leave a Reply

Your email address will not be published. Required fields are marked *

Enter the text from the image below