[Feb-2026] Dumps Brief Outline Of The CEM Exam – DumpsMaterials [Q69-Q85]


4.7/5 - (3 votes)

[Feb-2026] Dumps Brief Outline Of The CEM Exam – DumpsMaterials

CEM Training & Certification Get Latest Energy Management

NO.69 A compressed air system has a total volume of 247,500 liters. During a 30-minute break in production (air compressor system turned off and no production demand for compressed air), the system pressure drops from
7 bar, gauge (700 kPa, gauge) to 5 bar, gauge (500 kPa, gauge). Calculate the leakage rate in the compressed air system.

 
 
 
 
 

NO.70 Which of the following statements best describe Demand Control Ventilation (DVC) in Building Automation Systems?

 
 
 
 

NO.71 What is the definition of lamp life for a fluorescent lamp?

 
 
 
 
 

NO.72 Which of the following controls can optimize the operation of lighting systems?

 
 
 
 
 

NO.73 How can you tell if steam traps in a steam distribution system may NOT be working correctly?

 
 
 
 
 

NO.74 A refrigerant-to-water heat exchanger can be added to air-conditioning equipment to heat water using the waste heat in the vapor compression refrigerant cycle. Where is this type of heat exchanger located in the refrigerant loop?

 
 
 
 

NO.75 A high-pressure steam system passes 180°C condensate (saturated liquid) through a steam trap to an atmospherically vented condensate receiver tank. If the steam trap is working properly, how much of the condensate mass can be lost out the vent of the receiver tank in the form of flash steam?

 
 
 
 
 

NO.76 If outside air has a temperature of 25°C dry bulb and 15°C wet bulb, what is the enthalpy of the air?

 
 
 
 

NO.77 An energy-saving project costs $540,000. The project will have maintenance costs of $25,000 per year. The energy savings from the project are $160,000 per year. What is the simple payback of the project?

 
 
 
 

NO.78 What term describes the difference between the control signal value and the set point?

 
 
 
 
 

NO.79 When comparing two similar facilities, you see that the facility with newer, higher-efficiency equipment has a higher energy-use index [EUI] (kJ/m²-yr). What might be the cause?

 
 
 
 
 

NO.80 What is the purpose of top (or skimming) blowdown in a steam boiler?

 
 
 
 

NO.81 A cooling tower delivers 29°C water to a central chilled water plant. The cooling tower is capable of delivering water to the chilled-water plant with a 6°C approach temperature to the ambient wet bulb temperature. Using this information, what type of control strategy would you recommend be added to the cooling tower operation to save additional energy?

 
 
 
 

NO.82 What type of passive heat exchanger can wrap around an evaporator coil to precool entering air and reheat the air after the cooling coil without adding more moisture to the supply air stream?

 
 
 
 
 

NO.83 What is the main cause of low power factor?

 
 
 
 
 

NO.84 What instrument determines flow rate by measuring pressure differential?

 
 
 
 
 

NO.85 Using an interest rate of 15%, an energy project has a net-present value (NPV) of $3,500. Which statement is true about the project’s internal rate of return (IRR)?

 
 
 
 

Certification Training for CEM Exam Dumps Test Engine: https://www.dumpsmaterials.com/CEM-real-torrent.html

         

Related Links: www.stes.tyc.edu.tw myportal.utt.edu.tt myportal.utt.edu.tt myportal.utt.edu.tt myportal.utt.edu.tt swipy.ru

Leave a Reply

Your email address will not be published. Required fields are marked *

Enter the text from the image below